Power Desk
Grid Watch
Physical capacity layer
The grid is becoming the next compute bottleneck.
Power Signals tracks data center demand, generation, grid equipment, and cooling infrastructure as AI growth moves from silicon supply into physical load.
Data center load
0
Grid and generation
0
Cooling and electrical
0
Markets and policy
0
Signal map
Where the pressure is showing up
Current read
Data center demand is the lead lane in this run. Grid and generation stories define the second layer. Cooling and electrical gear need deeper sourcing next.
Signal board
Power desk entries
Source log